Progress is being made on Sierra No. 3, as our mechanical team draws closer to performing the final hydrostatic pressure test on the boiler! Meanwhile, work is being done to repair and repaint the wooden cab windows and door frames before they are reinstalled in the cab.
Over the ten or so years that Sierra No. 3 had been in service, a fair amount of wear and tear has taken its toll on various cab components. Nails and screws had begun to work their way loose, and the constant exposure to grease and grime proved impossible to clean. The best solution was to repair the stripped nail and screws holes with dowels, which were inserted into the worn holes in the wooden windows and doors, and new holes drilled.
While the repairs were being performed, this occasion proved to be a good opportunity to apply newly researched colors to these components. Since the locomotive was first restored in 2010, additional research has proven that the orange trim color more well known in recent years did not become common practice on Sierra Railroad steam locomotives until 1937.
Sierra Railway No. 3 on the point of a scheduled passenger train at Standard in 1927.

Before the railroad was reorganized in 1937, the exterior face of the windows and doors were painted black, while the interior faces and edges were painted green to match the rest of the locomotive cab interior. This was the common standard from at least as early as 1920 until the locomotives were all gradually repainted starting in 1935. As the chosen restoration period for Sierra No. 3 was its revenue service appearance circa 1929, the orange color was deemed inappropriate, and the new color research was applied. This research was based on color analysis performed many years ago on Sierra Railroad No. 34 by retired California State Railroad Museum Curator of History and Technology Kyle Wyatt.
While the mechanical work on the locomotive was being handled, our skilled maintenance staff and volunteers took on the work to restore the cab windows and doors. Great job everyone!
Maintenance Volunteer Lead Gary Hosman discusses the progress with Volunteer Steve Monroe.